![](https://nebil.com/wp-content/uploads/2023/12/thumbs_b_c_630b2a89519f55a0a220e7315f78b1e5.jpg)
RIYADH, KING KHALED ULUSLARARASI HAVALİMANI (Terminal T3-T4)
Kapsam Terminal 3’ün İç Hatlar Terminalinden Dış Hatlar Terminaline dön
![](https://nebil.com/wp-content/uploads/2023/12/pulkova-2.jpg)
PULKOVO ULUSLARARASI HAVALİMANI
Detaylar Yeni Ana Terminal Binası, Kuzey Galerisi ve yenilenen mevcut Pulkovo
![](https://nebil.com/wp-content/uploads/2021/08/whsd-2.jpg)
ST. PETERSBURG, WESTERN HIGH SPEED DIAMETER (WHSD)
Easily make it your own thanks to the smart layer.
![](https://nebil.com/wp-content/uploads/2023/12/airport-ongoing-projects01.jpg)
HAMAD ULUSLARARASI HAVALİMANI
Detaylar **Mustafa Nebil, 2011-2013 yılları arasında Hamad Uluslararası Haval
![](https://nebil.com/wp-content/uploads/2023/12/airport-projects11.jpg)
ENFIDHA HAMMAMET ULUSLARARASI HAVALİMANI
Detaylar **Mustafa Nebil, 2006-2010 yılları arasında Enfidha Hammamet Uluslar
![](https://nebil.com/wp-content/uploads/2023/12/muscat1.jpg)
MUSCAT ULUSLARARASI HAVALİMANI (Altyapı İnşaat ve Mekanik Elektrik İşleri)
Detaylar **Mustafa Nebil, 2009-2011 yılları arasında Muscat Uluslararası Hava
![](https://nebil.com/wp-content/uploads/2023/12/poas-aliaga.png)
FUEL FARM PROJECTS
POAŞ ALİAĞA Petrol Ofisi Aliağa Tesislerinin kapasite arttırım işleri kapsamı
![](https://nebil.com/wp-content/uploads/2024/01/anltaya-havaliman.jpg)
ULUSLARARASI ANTALYA HAVALİMANI YENİLEME PROJESİ
Detaylar Toplam inşaat alanı 185.000 m2, toplam kapalı alan 91.460 m2’dir. **