{"id":2264,"date":"2023-12-27T16:20:15","date_gmt":"2023-12-27T13:20:15","guid":{"rendered":"https:\/\/nebil.com\/?post_type=nproject&#038;p=2264"},"modified":"2024-02-12T14:38:29","modified_gmt":"2024-02-12T11:38:29","slug":"fuel-farm-projects","status":"publish","type":"nproject","link":"https:\/\/nebil.com\/en\/proje\/fuel-farm-projects\/","title":{"rendered":"FUEL FARM PROJECTS"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">POA\u015e AL\u0130A\u011eA<\/h2>\n\n\n\n<ol>\n<li><strong>Employer: <\/strong>D-YAPI \u0130n\u015faat Sanayi ve Ticaret A.\u015e.<\/li>\n\n\n\n<li><strong>Location:<\/strong>\u00a0\u0130zmir, T\u00fcrkiye<\/li>\n\n\n\n<li><strong>Project Scope:<\/strong>\u00a0Tank imalat ve montaj\u0131, Yak\u0131t ve Yang\u0131n Koruma Tesisat\u0131<\/li>\n\n\n\n<li><strong>Year: <\/strong>2006<\/li>\n<\/ol>\n\n\n\n<p>Petrol Ofisi Alia\u011fa Tesislerinin kapasite artt\u0131r\u0131m i\u015fleri kapsam\u0131nda 3 piece 20.000 m\u00b3, 1 piece 10.000 m\u00b3 silindirik tank imalat\u0131, 5,4 km yak\u0131t borulamas\u0131 ve manifold imalat\u0131, 1,5 km yang\u0131nla m\u00fccadele ve hidrant hatt\u0131 borulamas\u0131 ger\u00e7ekle\u015ftirilmi\u015ftir.<\/p>\n\n\n\n<p><strong><em>**Mustafa Nebil, 2004-2006 y\u0131llar\u0131 aras\u0131nda S\u00f6nmez Metal A.\u015e Genel M\u00fcd\u00fcr yard\u0131mc\u0131s\u0131 olarak g\u00f6rev yapm\u0131\u015ft\u0131r.<\/em><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"898\" height=\"562\" data-id=\"2406\" src=\"https:\/\/nebil.com\/en\/wp-content\/uploads\/2024\/01\/poas-haramidere.png\" alt=\"\" class=\"wp-image-2406\" srcset=\"https:\/\/nebil.com\/en\/wp-content\/uploads\/2024\/01\/poas-haramidere.png 898w, https:\/\/nebil.com\/en\/wp-content\/uploads\/2024\/01\/poas-haramidere-300x188.png 300w, https:\/\/nebil.com\/en\/wp-content\/uploads\/2024\/01\/poas-haramidere-768x481.png 768w\" sizes=\"(max-width: 898px) 100vw, 898px\" \/><\/figure>\n<\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">POA\u015e HARAM\u0130DERE<\/h2>\n\n\n\n<ul>\n<li>Employer: D-YAPI \u0130n\u015faat Sanayi ve Ticaret A.\u015e.<\/li>\n\n\n\n<li>Location:&nbsp;\u0130stanbul, T\u00fcrkiye<\/li>\n\n\n\n<li>Project Scope:&nbsp;Yak\u0131t ve Yang\u0131n Koruma Tesisat\u0131<\/li>\n\n\n\n<li>Year: 2008<\/li>\n<\/ul>\n\n\n\n<p>Petrol Ofisi Haramidere Tesisleri\u2019nin yenileme i\u015fi yap\u0131lm\u0131\u015ft\u0131r. Projede yang\u0131nla m\u00fccadele sistemi ve yak\u0131t hatlar\u0131 tesis \u00e7al\u0131\u015fmaya devam ederken yenilenmi\u015ftir. Toplam 80 km borulama i\u015fi ger\u00e7ekle\u015ftirilmi\u015ftir.<\/p>\n\n\n\n<p><strong><em>**Mustafa Nebil, 2004-2006 y\u0131llar\u0131 aras\u0131nda S\u00f6nmez Metal A.\u015e Genel M\u00fcd\u00fcr yard\u0131mc\u0131s\u0131 olarak g\u00f6rev yapm\u0131\u015ft\u0131r.<\/em><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"907\" height=\"623\" data-id=\"2408\" src=\"https:\/\/nebil.com\/en\/wp-content\/uploads\/2024\/01\/poas-derince.png\" alt=\"\" class=\"wp-image-2408\" srcset=\"https:\/\/nebil.com\/en\/wp-content\/uploads\/2024\/01\/poas-derince.png 907w, https:\/\/nebil.com\/en\/wp-content\/uploads\/2024\/01\/poas-derince-300x206.png 300w, https:\/\/nebil.com\/en\/wp-content\/uploads\/2024\/01\/poas-derince-768x528.png 768w\" sizes=\"(max-width: 907px) 100vw, 907px\" \/><\/figure>\n<\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">POA\u015e DER\u0130NCE<\/h2>\n\n\n\n<ul>\n<li>Employer: D-YAPI \u0130n\u015faat Sanayi ve Ticaret A.\u015e.<\/li>\n\n\n\n<li>Location:&nbsp;Kocaeli, T\u00fcrkiye<\/li>\n\n\n\n<li>Project Scope:&nbsp;Tank imalat ve montaj\u0131, Yak\u0131t ve Yang\u0131n Koruma Tesisat\u0131<\/li>\n\n\n\n<li>Year: 2006<\/li>\n<\/ul>\n\n\n\n<p>Petrol Ofisi Derince Tesisi kapasite artt\u0131r\u0131m\u0131 kapsam\u0131nda 2 piece 20.000 m\u00b3 ve 2 piece 10.000 m\u00b3 silindirik tank imalat\u0131, 2,5 km yak\u0131t borulamas\u0131, 3 piece 800 m\u00b3\/h yak\u0131t pompas\u0131 temin ve montaj\u0131, ana yak\u0131t hatt\u0131 manifold revizyonu, 3,5 km yang\u0131nla m\u00fccadele borulama ve hidrant i\u015fleri ger\u00e7ekle\u015ftirilmi\u015ftir.<\/p>\n\n\n\n<p><strong><em>**Mustafa Nebil, 2004-2006 y\u0131llar\u0131 aras\u0131nda S\u00f6nmez Metal A.\u015e Genel M\u00fcd\u00fcr yard\u0131mc\u0131s\u0131 olarak g\u00f6rev yapm\u0131\u015ft\u0131r.<\/em><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-3 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"896\" height=\"673\" data-id=\"2409\" src=\"https:\/\/nebil.com\/en\/wp-content\/uploads\/2024\/01\/poas-antalya.png\" alt=\"\" class=\"wp-image-2409\" srcset=\"https:\/\/nebil.com\/en\/wp-content\/uploads\/2024\/01\/poas-antalya.png 896w, https:\/\/nebil.com\/en\/wp-content\/uploads\/2024\/01\/poas-antalya-300x225.png 300w, https:\/\/nebil.com\/en\/wp-content\/uploads\/2024\/01\/poas-antalya-768x577.png 768w\" sizes=\"(max-width: 896px) 100vw, 896px\" \/><\/figure>\n<\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">POA\u015e ANTALYA<\/h2>\n\n\n\n<ul>\n<li>Employer: D-YAPI \u0130n\u015faat Sanayi ve Ticaret A.\u015e.<\/li>\n\n\n\n<li>Location:&nbsp;Antalya, T\u00fcrkiye<\/li>\n\n\n\n<li>Project Scope:&nbsp;Tank imalat ve montaj\u0131, Yak\u0131t ve Yang\u0131n Koruma Tesisat\u0131<\/li>\n\n\n\n<li>Year: 2006<\/li>\n<\/ul>\n\n\n\n<p>Petrol Ofisi Antalya Tesisleri i\u00e7in kapasite artt\u0131r\u0131m\u0131 projesi kapsam\u0131nda 4 piece 5.000 m\u00b3 silindirik tank imalat\u0131, yak\u0131t borulamas\u0131, yang\u0131n koruma ve hidrant hatlar\u0131 i\u015fleri ger\u00e7ekle\u015ftirilmi\u015ftir.<\/p>\n\n\n\n<p><strong><em>**Mustafa Nebil, 2004-2006 y\u0131llar\u0131 aras\u0131nda S\u00f6nmez Metal A.\u015e Genel M\u00fcd\u00fcr yard\u0131mc\u0131s\u0131 olarak g\u00f6rev yapm\u0131\u015ft\u0131r.<\/em><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>POA\u015e AL\u0130A\u011eA Petrol Ofisi Alia\u011fa Tesislerinin kapasite artt\u0131r\u0131m i\u015fleri kapsam\u0131","protected":false},"featured_media":2410,"template":"","nproject-category":[56],"nproject-tag":[],"acf":[],"_links":{"self":[{"href":"https:\/\/nebil.com\/en\/wp-json\/wp\/v2\/nproject\/2264"}],"collection":[{"href":"https:\/\/nebil.com\/en\/wp-json\/wp\/v2\/nproject"}],"about":[{"href":"https:\/\/nebil.com\/en\/wp-json\/wp\/v2\/types\/nproject"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nebil.com\/en\/wp-json\/wp\/v2\/media\/2410"}],"wp:attachment":[{"href":"https:\/\/nebil.com\/en\/wp-json\/wp\/v2\/media?parent=2264"}],"wp:term":[{"taxonomy":"nproject-category","embeddable":true,"href":"https:\/\/nebil.com\/en\/wp-json\/wp\/v2\/nproject-category?post=2264"},{"taxonomy":"nproject-tag","embeddable":true,"href":"https:\/\/nebil.com\/en\/wp-json\/wp\/v2\/nproject-tag?post=2264"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}